Nate B Jones

Why the AI boom is about to hit a wall

🇬🇧 EN🇪🇸 ES
Complete 23:37 min youtube 2026 Week 21 May 24, 2026 🇬🇧 EN
TL;DR
Research summary

▶ Microsoft’s capacity constraint changes AI procurement

The speaker opens with Microsoft’s Q3 earnings call on April 29th, where Satya Nadella said the company would spend $190 billion on CapEx in the calendar year and still expected to be capacity constrained through year end. The speaker argues that the constraint is below the GPU: producing chips packaged with the memory needed for modern AI workloads. They say the scale of hyperscaler spending and continued rationing means AI vendor contracts now function like supply contracts, with allocation, capacity terms and fallback provisions. The speaker frames the discussion around defining capacity constraints, locating supply-chain bottlenecks and identifying questions for AI investments. They argue that traditional software procurement assumptions may understate developers’ role and the need to verify whether vendors can secure hyperscaler capacity to serve inference tokens. They say this affects rollout and operations across a business, and cite their own gross token spend of almost 500 million tokens in one week as a reason to equip engineers with tools that can handle high usage.

▶ AI products rely on physical factories

The speaker urges viewers to stop treating AI as ordinary software with a sophisticated backend. They describe each model answer as output from a production chip system, involving chips, memory, packaging, networking, power, cooling, land, data-center construction and operations talent. They call the complete system an AI factory that turns demand into served tokens. They cite Microsoft’s $190 billion planned spend, Meta’s April guidance of $125–145 billion for the year—which they say was raised because component prices were up and more data centers were needed—Amazon’s deployment of more than 2.1 million AI chips in the prior 12 months, more than half its own training and silicon, multi-gigawatt commitments from Anthropic and OpenAI, and more than a million Nvidia GPUs to be deployed through 2027. They also cite Google’s $185 billion spend last year. The speaker argues that these firms should be treated as physical infrastructure companies because their unit economics and the AI available to customers depend on this investment. As an example of an infrastructure module, they describe Nvidia’s GB200 NVL72 as a liquid-cooled rack-scale system with 72 Blackwell GPUs and 36 Grace CPUs in one NVLink domain, 13.5 terabytes of HBM3E memory and 576 terabytes per second of memory bandwidth; Nvidia presents it as infrastructure for real-time trillion-parameter inference.

▶ Memory, packaging and networking bottlenecks

The speaker calls high-bandwidth memory the most constrained input in the supply chain, saying compute can sit idle if data cannot move fast enough and that companies may have GPUs on paper but still lack enough HBM to ship usable accelerators. They explain that packaging integrates logic dies and HBM stacks; TSMC’s CoWoS connects compute and memory at the bandwidth AI workloads require. Substrates and interposers also matter, and a drop in substrate yield could slow production despite a strong chip design. They say large clusters are communication as well as compute systems: copper has limits in heat, distance and signal integrity, so networks at hundreds of thousands of GPUs need to be optical. They cite Nvidia’s Spectrum-X photonics announcement as an example of the shift at shipped-product scale. The speaker then ties capacity to firm power at the right location and time, noting an IEA projection that global data-center electricity consumption will roughly double to about 945 terawatt-hours by 2030, while arguing that a particular site may still lack timely power. They also describe dense AI racks’ heat loads, the role of liquid cooling in production capacity, and the risk that hardware will not run at full power if cooling is inadequate. Construction and power interconnection can extend schedules: CBRE is cited as saying traditional 12–18-month data-center timelines no longer work as rough estimates for 500 MW-plus AI campuses, with transmission and interconnection potentially pushing schedules past 18 months and into a four-year range. Meta’s Hyperion campus in Louisiana, a joint venture with Blue Owl Capital, is cited as a multi-year construction project.

▶ Integrated capacity and the capital cycle

The speaker lists chips, memory, packaging, substrates, optics, power, cooling and construction as layers with different suppliers and timelines, any of which can constrain a data center and an AI strategy. They cite Epic AI estimates that in 2025 the four largest AI chip designers consumed about 90% of global chip-packaging capacity and 90% of HBM memory supply, but only 12% of advanced logic-die production. The speaker interprets this as evidence that the bottleneck is integrating compute supply to serve tokens at scale, rather than designing better chips or simply obtaining GPUs. They advise executives to ask where a supply-chain delay would stop AI from shipping and urge candid contract discussions about allocation, capacity, delivery and fallback, including acknowledgement of uncertainty. The speaker connects this to financial risk and says the capital-cycle discussion helps explain why they do not think the AI sector is in a bubble. They note that traditional software finance measures such as revenue growth, gross margin, sales efficiency, retention and free cash flow still matter, but AI adds an asset cycle: GPU depreciation runs 3–5 years, while data-center shells last longer, models and serving stacks need refreshing, and some shells may not support newer racks. They say CFOs should ask whether capacity can earn enough before the next hardware generation changes the cost curve. Token utilization is presented as a central operating metric because depreciation continues even when tokens are not served. They ask whether contracts provide guaranteed capacity, best efforts or a queue position, and point out that cloud providers also need compute for their own products: Microsoft for Copilot and Azure customers; Google for Gemini, Cloud, Search and Workspace; Amazon for AWS, Bedrock and Trainium commitments. Meta may have fewer customer allocation conflicts because demand is mostly internal, the speaker says, but must fund the system itself.

▶ Forecast usage and account for falling serving costs

The speaker says forecasting seats, users, licenses and projects is insufficient, and recommends estimating tokens per workflow, context length, model calls per task, agent loops, concurrency, latency tiers, and failure and retry rates. They contrast a customer-support chatbot with an autonomous claims-processing agent, and an occasional-use coding assistant with an agent that reads a repository, writes code, runs tests and loops for hours or days. They warn that forecasting adoption can underbudget capacity, while forecasting budget can lead to overpaying for the wrong layer. The speaker then notes that serving costs are falling: Epic AI reportedly found that prices for the same performance level fell at different speeds across tasks, in some cases by orders of magnitude per year. Smaller models, distillation, caching, batching, quantization, speculative decoding and better routing are listed as ways to serve more work with the same capacity. The speaker predicts that intelligence comparable to Opus 4.7 or ChatGPT 5.5 in May 2026 may be available on an open-weights model for free and runnable on one’s own stack in December. They cite Microsoft’s statement that Copilot inference throughput rose 40% in the last quarter through software and hardware optimization, characterizing efficiency gains as equivalent to building more factory capacity without construction. They add that cheaper tokens can increase demand through longer contexts, more agents and more read/writes. The speaker says the CapEx bet depends on whether demand continues to outrun efficiency; if efficiency gains outrun demand, the industrial-base case weakens, but if usage grows faster than capacity, more construction is needed. They refer viewers to a Substack piece with unit-economic signals and a practical bubble test, saying that by that test they are not in a bubble yet.

▶ Three operational questions for AI investments

The speaker offers three questions for an AI investment review. First: what portion of vendor spend is reserved capacity versus best-efforts allocation, and what is the concrete plan if the default provider is supply constrained for perhaps a month or two? They say a good vendor relationship is not a plan and that an allocation tier should be written down. Second: what is the plan for routing requests to cheaper models, and how will savings be measured without degrading user experience? The speaker says companies may run expensive models on tasks that do not require them because they lack a routing layer. Third: in the top three AI workflows, where might hidden human supervision be masking product failure, and how would the organization know if that supervision disappeared? They say demos can appear clean because a human is in the loop, while production traffic differs; if supervision is not visible, pricing, scaling or removing it will be difficult. The speaker characterizes these as operational purchasing questions and points to a Substack version with a bill of materials, procurement framework and token-forecasting model.

▶ Treat AI strategy as a production line

The speaker contrasts the cloud era’s elastic-compute abstraction, where developers could act as if infrastructure were always available, with AI intelligence that is constrained by an industrial factory. They say Microsoft’s $190 billion CapEx matters because software companies must now manage supply assurance, throughput optimization, capacity scheduling, utilization and depreciation. Executives should understand where power and tokens come from, which data center supplies them, whether capacity will be there, and what happens if a vendor signs 20 more customers. The speaker describes due diligence as covering every layer of the factory and says purchasing AI is effectively buying a share of an industrial factory and its tokens. They conclude that the factory makes intelligence possible and tokens are what it manufactures. After the main sign-off, the speaker adds that this physical-infrastructure-connected intelligence economy makes the problem space more interesting: in the 2010s, they say, software often felt interchangeable and MBA-style executive choices could transfer between companies, whereas now deeper investigation is required.

Full transcript
[00:00] On Microsoft's Q3 earnings call on April 29th, Satcha Nadella told investors the company will spend $190 billion on capex in this calendar year and still expects to be capacity constrained through year end. Capacity constrained. The most valuable software company on the planet with $190 billion to spend cannot get enough capacity to meet its own demand. Let that sink in for a second. When when Satcha Nadella says capacity constrained, he does not mean Microsoft ran out of GPUs. I want to be precise.
[00:30] The supply problem is a layer below the GPU. It's about whether you can actually manufacture enough chips packaged with the memory they need to keep up with the kind of workloads modern AI models actually run. Remember when we were in a bubble about a year ago? Yeah, that didn't last very long, did it? The constraint here isn't logic chips. It's the part of the supply chain almost nobody in the boardroom is really fluent in yet. And that's the gap I want to walk you through today because it's about to land on every leader's AI
[01:01] vendor conversation. And I know what some of you are thinking, Nate, calling AI industrial, that's not really new. Like, I've heard that before. Mary Mer did 340 slides on this last year. Nvidia earnings calls Jensen hammers this every quarter. Yes, that's true. But we are not fully tracking what Satcha's capex spend that he announced means for all of us, all of our AI vendors, the entire AI supply chain because six months ago, an AI vendor contract was structured a lot
[01:31] like a software contract. Now with the hyperscalers spending at this scale and still rationing really heavily, your AI vendor contract is effectively tied into the hyperscalers. It is a supply contract in everything but name. It has allocation. It should have capacity terms. It should have fallback. It should have line items that we didn't have to think about a few months ago because we are so capacity constrained. Now, there's three things I want you to walk away with here. First, when we talk about capacity constrained, what do we mean underneath the headlines? Second,
[02:03] where is the bottleneck in the AI supply chain really? And what are the numbers behind that? And third, what are the questions that guide your next AI investment that should fall out of that conversation and that understanding? So that's what we're going to get to today. Now, why do I care so much about investments and software and the AI supply chain? Because fundamentally, I think that a lot of our experience with AI is tied down by our assumptions about how software has always been sold. I think that shapes our assumptions
[02:33] about who gets to be at the table for a procurement decision. Namely, I think developers are under reppresented. Uh I think it also shapes our ability to understand what should be in a good agreement for an AI native software company. Because if we're doing traditional software agreements, we can reasonably assume that the vendor working with us, the supplier working with us has the ability to control their own destiny enough that they can write that agreement. Now, it's a much more complicated conversation with AI native
[03:04] tools because you have to ask yourself, one, do I need this tool at all? And I've had a whole video that I made on that. You can find that one. And two, if I do need this tool, I determined that I need it. In that situation, is this vendor appropriately accounting for the fact that they need to get hyperscaler capacity to allocate tokens to me as a part of the service? Because they're no longer serving deterministic software. They are serving inference. They are serving intelligence. I am buying intelligence from them. I need to
[03:35] have contractual terms that protect me and help me to understand that. And if you think, "Wow, that's boring. That's something only the CFO should think about." You got another thing coming. I if we don't get those terms right, you can't roll it out to developers correctly. You can't roll it out in your AI operations correctly. You're going to run out of capacity when you really need it. It affects the entire business. It is absolutely an entire leadership conversation. And it's also a conversation where you need to have engineers at the table who can then speak to whether what is being allocated
[04:05] is actually usable. Have you looked at your engineers token spend recently? You should because it may surprise you. My gross token spend over the last week was almost 500 million tokens in one week. And if you have engineers like that on your team, you'd better make sure that you are equipping them with tools that are equipped to handle that. Okay, let's jump into it. Stop thinking of AI as a software product with a fancy backend. The visible product may look like software you have. Chad, GPT, Copilot,
[04:35] Gemini, Claw, these look like applications that you open and non-technical employees may think of them that way, but the constraint underneath them is actually all the way down to the metal in the chip. Every answer from a model is the output of a production chip system. So, chips, memory, packaging, networking, power, cooling, land, data center construction, and operations talent. A user will see a paragraph generated on a screen, but every word in that paragraph came out of a factory. And when I say an AI factory, I am not talking about a building full of GPUs only. I mean the entire whole
[05:06] production system that turns demand into serve tokens. I mean chips run the math. High bandwidth memory feeds the chips. Packaging connects them together. Networking moves data across the cluster. Power keeps the racks alive. Cooling keeps them at temperature. Operations keeps the whole thing utilized. The most valuable software companies in the world are spending hundreds of billions of dollars a year because they have to operate factories. Now, intelligence at scale has a very physical bill of materials that software never did. Microsoft's not alone.
[05:36] Everybody's figured this out. Meta said in April it's going to spend 125 to$145 billion this year. They had to raise that guidance because component prices are up and they need more data centers. They can't compromise on that. Amazon landed, by the way, Meta is losing the AI race and they still need to spend that much. There is no way out of this. Amazon landed more than 2.1 million AI chips in the last 12 months. More than half of those were their own tranium silicon. On top of that, they've got multi-gawatt commitments from Anthropic
[06:06] and OpenAI, plus more than a million Nvidia GPUs they're going to deploy through 2027. Google did $185 billion in spend last year, and I covered that one back in February. The the pattern is bigger than any single company. The pattern here underscores how big a shift we're seeing in traditional software companies. We need to stop assuming that these companies are software companies and assume and treat them as if they're physical infrastructure companies. That is how their unit economics work now. It is a totally different world. and their
[06:37] decision to move into that world and invest heavily is shaping the intelligence that the rest of us are getting either directly from them or from vendors who build on top of their stacks. It shapes everything right now. If a vendor tells you they're investing in AI infra, they typically mean the very thin layer on the top of this whole factory system. I want to take you on a little bit of a deeper tour because vendors can't control what I'm about to tell you about by and large. Not unless they're hyperscalers and even then you have to be scaled enough to have the conversation. Let's start by looking at
[07:08] the physical unit of infrastructure that drives this entire factory world. I'm not talking about a GPU or a TPU. That's the engine. I'm talking about the module. So Nvidia's GB200 NVL72 is a great example of what an industrial module that drives this world actually looks like. It's a liquid cooled rack scale system connecting 72 Blackwell GPUs and 36 Grace CPUs into a single what's called Envyink domain. It comes with 13.5 terabytes of HBM3 memory, 576
[07:42] terabytes per second of memory bandwidth and Nvidia talks about it as the infrastructure for real time trillion parameter inference. It's the core building block of an AI factory. It's a whole lot more than a graphics card because a chip alone doesn't produce intelligence at scale. It needs the memory close to it. It needs that packaging. It needs that networking. It needs a place to run. And memory is part of why this whole thing is getting complicated right now. Right? High bandwidth memory, as I've talked about, is the single most constrained input in
[08:13] the whole supply chain. If you are not able to move data fast enough, all of your compute will sit idle. And moving data fast requires a good memory stack. A company can have plenty of GPUs on paper and still not be able to ship usable AI accelerators because they cannot get enough high bandwidth memory. Packaging gets even more physical. You have to integrate the logic dies and the HBM stacks into a single working chip package. TSMC's co-ass is what connects compute and memory at the bandwidth AI
[08:43] workloads need to operate. And then underneath the packaging there are substrates, there are interposers, the pieces that carry those signals and hold the components in alignment. If substrate yield were to drop, the production line would slow down even if the chip design were excellent. Optics and optical compute matter now because large AI clusters are communication machines as much as they are compute machines. The GPUs need to move an enormous amount of data back and forth between one another. Copper has limits at scale, right? It has limits around heat, around distance, around signal
[09:14] integrity. At hundreds of thousands of GPUs, the network has to be optical. Nvidia's Spectrumx Photonix announcement is what that shift looks like when you're actually getting to a shipped product scale. Let's go back even further. Let's look at the power side. You are actually thinking about power when you are thinking about where the vendor you're talking about is getting their capacity from. You have to say like, do you have guaranteed capacity? And that comes down to does the data center have power. All of this is turning the traditional 2010s era cloud
[09:45] is invisible conversation into a very visible, very real AI factory conversation that most software companies are not remotely ready to handle. They just aren't ready for a world where the software you buy is intelligent and that intelligence requires understanding electricity and power for a factory. Power is sucking up a lot of the dollars Satcha talked about, right? The grid argument is all over the place and most of it isn't getting at the level of detail that I
[10:16] think is useful. The IEA is projecting global data center electricity consumption roughly doubling to about 945 terowatt hours by 2030. So that's a headline. But 945 terowatt hours is not what anybody's actually dealing with. The real constraint is firm power at the right location on the right schedule. The country might have plenty of power on paper, but a specific site may not get the power it needs to stand up a data center in time. And that's where a
[10:46] lot of the reporting has come in around local communities and their push back on data centers and power, etc. Cooling is another big piece that is the more local, more physical than than people realize. Dense AI racks generate heat at levels old data center designs were not built to handle. Liquid cooling is part of production capacity today. If the cooling can't handle the rack density, the hardware doesn't actually run at full power. Uh, and so then you need to go and look and say, do we have the electricity? Do we have the chips? Do we have the power? And can we put it together? Can we physically assemble all
[11:18] of that into a data center that works? And and again, software companies are not used to having to manage construction timelines. That is a new thing for them. Even Google, which is good at data centers and has been good at data centers for a while, isn't used to this level of scale. The CBRE notes that traditional 12 to 18month data center timelines are really no longer useful as back of the envelope calculations. They just don't apply to 500 megawatt plus AI campuses because the cost of construction, the challenge of construction is so high. Uh because
[11:48] even transmission and interconnection for power can stretch that schedule well past 18 months up into the four-year range. Meta's Hyperion campus in Louisiana, which is a joint venture with Blue Owl Capital, is already a multi-year construction project. And I could pick out other ones. So, we've talked about a few layers here. We have chips, memory, packaging, substrates, optics, power, cooling, construction. Every one of these layers has different supply chain players and different timelines. Any one of them can be the bottleneck or constraint for a given
[12:19] data center that determines whether your AI strategy delivers. And all of this physical infrastructure is becoming much more of a concern than just the cost of designing chips or getting the chips exactly right. So Epic AI estimates that in 2025, the four largest AI chip designers consumed about 90% of global chip packaging capacity. Remember we talked about packaging, networking, linking, etc. And 90% of HPM memory supply. We talked about memory. But the same four designers consumed only 12% of
[12:52] advanced logic die production. In other words, 12% of the design bandwidth in the world for chips was used to support a 90% utilization of packaging and memory to bring us AI. So the bottleneck was never our ability to design better chips. It's not even GPUs. It's the ability to turn all of this into an integrated compute supply that enables real tokens to be served at scale. And
[13:22] that's what Satcha means when he talks about capacity constraint and how he has to spend his way out of it. The useful executive question isn't who benefits from AI capex. That turns into stock picking really fast. the the better question is where in the supply chain does a delay stop you from shipping AI? And so this is where you need to think really carefully about the contracts you're signing. Every AI vendor contract does sit on top of that supply chain.
[13:54] Most of the time, nobody wants to talk about that. The buyer feels embarrassed to ask because it feels like digging in the closet. And the vendor doesn't want to talk about it because they may not have a full answer on allocation, on capacity, on delivery, and on fallback. You want to be in a position where you can just be honest and have that conversation and acknowledge the uncertainty and get into it. Now, every agreement is a financial agreement, and I want you to understand a little bit of the capital cycle in detail so you can understand how all of this is put together. Incidentally, this is also going to help you understand not only
[14:26] where there's software vulnerabilities that can translate into bottom line issues, but also where and how larger hyperscalers are managing their risk to avoid getting into an overleveraged blow up the bubble scenario. And this is part of why this whole discussion of finance is part of why I don't think we're in an AI bubble. So software finance traditionally focused on stuff like revenue growth, gross margin, sales efficiency, retention, free cash flow. Those are still important, but AI adds a much tougher capital cycle underneath
[14:57] that. GPU depreciation runs between three and five years. Data center shells last a whole lot longer. So the model and the serving stack need to be refreshed. The asset lives don't match. In some cases, the data center shells are not in a position where they can be reused with the newest racks. And so the question CFOs need to learn to ask is, can we earn enough from this capacity before the next hardware generation changes the cost curve? And I realize that if you are not a hyperscaler CFO,
[15:27] you may think you're exempt from that conversation. But as I've shown you, everything goes back to the factory. We have to be able to have these conversations to apply intelligence in our firms. Utilization of tokens is a central operating metric. Now, an AI factory with low utilization is dangerous because the depreciation clock is going to run whether the tokens are served or not. And this gets into the idea of token allocation and how you're protected. When demand exceeds supply upstream of the vendor, do you have
[15:57] guaranteed capacity? Do you have a best efforts promise? Do you have a Q position? So, the hyperscaler in this sense is also your competitor for the same compute, right? Microsoft needs GPUs for Copilot and for Azure customers. Google needs them for Gemini and cloud and search and workspace. Amazon needs them for AWS and bedrock and tranium commitments. Meta has maybe fewer customer allocation conflicts because most of the demand is internal, but that means Meta has to fund the whole thing itself. I want you to dig in deeper on how cloud providers are also
[16:29] potentially competitors, not just from a product perspective, but from a chip and allocation perspective. If you want that full procurement breakdown, you can grab it at the Substack. I go real deep there. For now, we're going to stay at that level and move on to forecasting demand, which is another big piece that we need to understand better if we're going to make good agreements around investing in AI. Forecasting AI usage in seats, users, licenses, and projects is something I see pretty frequently. You need to go farther. You need to forecast tokens per workflow for context length,
[17:00] for model calls per task, for agent loops, for concurrency, for latency tiers around failure and retry rates. A customer support chatbot and an autonomous claims processing agent do not consume capacity in remotely the same way. And that's just one example. A coding assistant that answers occasional questions is very different from an agent that reads your repository, writes code, runs tests, and loops for hours or days. If you forecast adoption, you will underbudget capacity. If you forecast budget, you will overpay for the wrong
[17:32] layer. Now, I want to be honest about the other side of all of this. I've talked mostly about all of the costs and all of the complexity of taking traditional massive software businesses and turning them into AI factories that underpin the intelligence economy. Let's look at the good news. Serving costs have been falling quickly. Epic AI found that prices for the same performance level have fallen at very different speeds across tasks, but they're all falling in some cases by orders of magnitude per year. Smaller models, distillation, caching, batching,
[18:03] quantization, speculative decoding, better routing, all of these increase the work you can serve for the same capacity. If you are excited about a model like Opus 4.7 or Chad GPT 5.5 today in May of 2026, you will probably have the same intelligence on an open weights model for free that you can run on your stack in December. I have a specific example on efficiency that I think tells the story here. Microsoft said co-pilot inference throughput the ability to push tokens through went up
[18:34] 40% in the last quarter just from the team there optimizing software and hardware. Efficiency gains like that are equivalent to building more factory without breaking ground. So the cost improvements are real, but they don't change the fact that this is still an industrial business. Cheaper tokens can also create and do also create more token demand. It's Jven's paradox, right? Longer contacts, more agents, more retries. It's part of why we're token constrained in May is because we got better agents in January. Uh and so
[19:04] if efficiency gains outrun demand growth, the whole idea of the industrial base that we're building starts to like become more of a bare case. It starts to soften. If cheaper intelligence causes usage to explode faster than capacity arrives, which is what we see so far, then we are in a bind where we have to build and build and build and build and build and the capex is a bet that demand continues outrunning efficiency. And that's that's what we have so far. And that's something that I want to dig into in more detail. So, I wrote a whole piece on the unit economic signals and what to watch for in 2026 and that help
[19:36] you understand like capacity proof and they give you a practical bubble test. By that test, we are not in a bubble yet, but you can run it yourself. It's over on the Substack. If your CFO is asking whether AI capex is sustainable, that is the briefing to show them. The link is is below in the comments. So, let me close with three questions to bring to your next AI investment review. If you remember nothing else from this video, write these down. Number one, what share of your AI vendor spend is reserved capacity versus best efforts
[20:07] allocation. And what is the concrete plan if your default provider becomes supply constrained for a period of time, maybe up to like a month, two months, we have a great relationship with the vendor is not a plan, by the way. You have to have an allocation tier and it needs to be written down. Question two, what is your specific routing plan for sending to cheaper models? And how will you measure the savings without degrading the user experience? Companies are running expensive models against tasks they don't need to because nobody has built a routing layer. And that's margin that's just sitting on the floor.
[20:38] Three, in your top three AI workflows, where is hidden human supervision masking product failure that is relevant from a purchase perspective? And how would you know if that supervision disappeared? So many of these vendor demos run really clean because a human is in the loop somewhere and you wave your hands through it when you have the demo, right? Production traffic isn't a demo scenario. If you cannot see the human supervision, you're going to have trouble pricing it, scaling it, or removing it. So these questions are very
[21:08] much operational questions. These are the questions I would be asking if I were being asked to think about AI as software and whether we buy it and where we buy it and who we buy it from. I get into a fuller version of these questions on the substack plus a bill of materials, a procurement framework, token forecasting model, all of that. If you want to walk into the next budget meeting, go grab that, right? You you'll be all set. But let's step back for a minute. In the cloud era, the winning abstraction was elastic compute. Developers built as if infrastructure was always available. The physical world
[21:38] kind of receded away. That abstraction is broken now. Intelligence isn't infinitely elastic. It's constrained by an industrial factory. Microsoft's $190 billion capex matters because the world's most valuable software companies have to think like industrial operators now. They have to have supply assurance, throughput optimization, capacity scheduling, utilization management, depreciation, discipline. Those are words your CFO is about to start using. Your AI strategy is a production line. It's it's it's like it's in a factory,
[22:09] right? You have to be thinking and aware of where that power those tokens are coming from. Are they coming from a particular data center? Do you know the data center? Do you know what's going to be there? Do you know if there's more capacity there? If that vendor signs on 20 more customers, you should know these things. The executive job is changing. That is one of the big themes for me in 2026. And one of your jobs is due diligence. I've talked about due diligence across technical considerations and workflows internally. This video is about owning the decisions
[22:39] across every layer of the factory. when you make a purchase, you're effectively buying a share in an industrial factory and you're buying a share of those tokens. Are are you ready for that? Are you thinking about that? That's a whole lot different from what the MBA's degree will tell you about buying software. It's not software anymore. The factory is what makes intelligence possible. Tokens are what it manufactures. We are in the intelligence economy and you got to get ready. So, sign up, get excited, and uh I'll see you next time. This has never been. One of the things I love
[23:10] about this whole journey toward a physical infrastructure connected intelligence economy is that it makes the problem spaces so much more interesting because for so long you could be in a world in the 2010s where software tasted like chicken. It was all the same. And whatever you did as an exec with an MBA, you could do the same thing at the next company. Not anymore. It's way more interesting than that. This is an example of how deep you have to dive. Jump in. Get excited.

← Back to videos list